期刊论文:
[1] Wang, P., Dou, J., Su, W.,Jiang, Z., & Shi, Y. An energy management strategy based on dynamicprogramming for fuel cell hybrid trucks in ports[J]. International Journal of Hydrogen Energy, 2024,82, 123-133. (SCI, Q1)
[2] Zhang, Canran, Dou Jianping,and Wang Pingyuan. Configuration design of reconfigurable single-product robotic assembly line for capacity scalability[J]. Computers & Industrial Engineering,2023, 185. doi:10.1016/j.cie.2023.109682.(SCI, 中科院一区)
[3] Zhang, C., Dou, J., Wang, S.and Wang, P. Hybrid particle swarm optimization algorithms for cost-oriented robotic assembly line balancing problems[J]. Robotic Intelligence and Automation, 2023, 43(4): 420–430. (SCI, Q3).
[4] Jianping Dou, Shuai Wang,Canran Zhang, Yunde Shi. A genetic algorithm with path-relinking for operationsequencing[J]. The International Journal of Advanced Manufacturing Technology,2023, 125: 3667-3690.(SCI, Q2)
[5] 张灿然,窦建平,王帅等.混合离散粒子群算法求解机器人装配线平衡问题[J].东南大学学报(自然科学版),2023,53(02):349-355.
[6] Jianping Dou, Jun Li, Dan Xia,and Xia Zhao. A multi-objective particle swarm optimisation for integrated configuration design and scheduling in reconfigurable manufacturing system[J].International Journal of Production Research, 2021, 59(13): 3975-3995. (SCI,Q1)
[7] 吴东阳,窦建平,李俊. 四旋翼飞行器的数字孪生系统设计[J]. 计算机工程与应用,2021,57(16): 237-244.
[8] Jianping Dou, Chun Su, XiaZhao. Mixed Integer Programming Models for Concurrent Configuration Design and Scheduling in Reconfigurable Manufacturing System[J]. Concurrent Engineering:Research and Applications, 2020, 28(1): 32-46.(SCI检索, 表现不俗)
[9] Xia Zhao, Jianping Dou.Bi-objective integrated supply chain design with transportation choices: Amulti-objective particle swarm optimization[J].Journal of Optimization inIndustrial Engineering, 2019, 15(3): 1263-1288.(SCI检索)
[10] 窦建平,李俊,苏春. 基于可行工序序列遗传算法的工序排序优化[J]. 计算机集成制造系统,2019,25(8): 1981-1990
[11] Jianping Dou, Jun Li, Chun Su.A discrete particle swarm optimisation for operation sequencing in CAPP [J]. International Journal of ProductionResearch, 2018, 56(11): 3795-3814.(SCI检索)
[12] Meng X, Li J, Dai X, Dou J.Variable Neighborhood Search for a Colored Traveling Salesman Problem[J]. IEEE Transactions on IntelligentTransportation Systems, 2018, 19(4): 1018-1026.(SCI检索)
[13] Su C, Shi Y, Dou J.Multi-objective optimization of buffer allocation for remanufacturing systembased on TS-NSGAII hybrid algorithm[J]. Journalof Cleaner Production, 2017, 166: 756-770.(SCI检索)
[14] Jianping Dou, Jun Li, Xia Zhao.A novel discrete particle swarm algorithm for assembly line balancing problems[J]. Assembly Automation, 2017, 37(4): 452-463.(SCI检索)
[15] Jianping Dou, Jun Li, Chun Su.Bi-objective optimization of integrating configuration generation andscheduling for reconfigurable flow lines using NSGA-II[J]. The International Journal of Advanced Manufacturing Technology,2016, 86(5): 1945–1962. (SCI检索)
[16] Jianping Dou, Jun Li, Chun Su.A novel feasible task sequence-oriented discrete particle swarm algorithm forsimple assembly line balancing problem of type 1[J].The International Journal of Advanced Manufacturing Technology,2013,69(9-12):2445–2457. (SCI检索)
[17] Jianping Dou, Xingsong Wang andLei Wang. Machining Fixture Layout Optimisation under Dynamic Conditions Basedon Evolutionary Techniques[J].International Journal of Production Research, 2012, 50(15): 4294-4315.(SCI检索)
[18] Jianping Dou, Xianzhong Dai& Zhengda Men. A GA-based approach for optimizingsingle-part flow-line configurations of RMS[J]. Journal of Intelligent Manufacturing,2011, 22(2): 301-317. (SCI检索)
[19] Jianping Dou, Xianzhong Dai& Zhengda Meng. Optimisation for multi-part flow-lineconfiguration of reconfigurable manufacturing system using GA[J].International Journalof Production Research, 2010, 48(14): 4071–4100. (SCI检索)
[20] Jianping Dou, Xianzhong Dai& Zhengda Meng. Precedence graph oriented approach to optimisesingle-product flow-line configurations of reconfigurable manufacturingsystem[J].International Journal ofComputer Integrated Manufacturing, 2009, 22(10): 923-940. (SCI检索)
[21] Jianping Dou, Xianzhong Dai,Zhengda Meng.Graph theory-based approach to optimize single-product flow-lineconfigurations of RMS[J].TheInternational Journal of Advanced Manufacturing Technology, 2009,41(9):916-931. (SCI检索)
[22] 窦建平,李俊,苏春. 可重构流水线构形选择和作业调度集成优化[J].东南大学学报:自然科学版, 2015, 45(5): 886-896. (EI检索)
[23] 窦建平,苏春,李俊. 求解第I类装配线平衡问题的离散粒子群优化算法[J].计算机集成制造系统,2012,18(5):1021-1030.(EI检索)
[24] 窦建平,戴先中,李俊. 基于遗传算法的可重构制造系统多零件流水线构形优化[J].计算机集成制造系统,2010, 16(7),1390-1400.(EI检索)
[25] 窦建平,戴先中,孟正大,李俊. 基于图论的可重构制造系统单零件流水线构形优化[J].计算机集成制造系统,2010,16(1),81-89.(EI检索)
会议论文选:
[1] WangShuai, Dou Jianping, Zhang Canran. Path-relinking Grey Wolf Optimizer forSolving Operation Sequencing Problem[C]. 2022 IEEE International Conference onMechatronics and Automation (ICMA). IEEE, 2022: 1375-1380.
[2] WenhaoLiu, Jianping Dou, Pingyuan Wang. An energy management strategy based ongenetic algorithm for fuel cell hybrid yard truck[C]. 2022 IEEE InternationalConference on Mechatronics and Automation (ICMA), Guiling, China, 2022, pp.852-857
[2] ChaodanZhao, Jianping Dou,Xia Zhao. A Discrete Particle SwarmOptimization for Storage Location Assignment Problem of Retail E-Commerce [C].2021 IEEE International Conference on Mechatronics and Automation (ICMA),Kagawa, Japan, 2021, pp. 313-318. (EI)
[3] JianpingDou, Xia Zhao, Qi Sun. Robust Optimization Models of Integrated ConfigurationDesign and Scheduling for Reconfigurable Flowline. 2019 IEEE InternationalConference on Mechatronics and Automation (IEEE ICMA2019), 2019, Aug4-7,Tianjin, 70-75.
[4] JianpingDou, Xia Zhao, Chun Su. An Improved Genetic Algorithm for Optimization ofOperation Sequencing[C]. 2018 IEEE International Conference on Mechatronics andAutomation (IEEE ICMA2018), 2018, Aug 5-8, Changchun, 695-700. (EI 检索)
[5] JianpingDou, Xia Zhao. A Feasible Sequence oriented Discrete Particle SwarmOptimization for Operation Sequencing in CAPP[C].Proceedings of the ASME 2017International Design Engineering Technical Conferences & Computers andInformation in Engineering Conference (IDETC&CIE), 2017, Cleveland, USA.(August 6-9)(EI 检索)
[6] JianpingDou, Jun Li, Qi Lv. A Hybrid Particle Swarm Algorithm for Assembly LineBalancing Problem of Type 1[C]. 2011 IEEE International Conference onMechatronics and Automation (IEEE ICMA2011), 2011, Aug 7-10, Beijing,1664-1669.(EI: 20114614521475)
[7] Jianping Dou, Xingsong Wang, Lei Wang. Machining fixture layout optimization using particleswarm optimization algorithm. The Forth International Seminar on Modern Cutting& Measuring Engineering (ISMCME 2010), December 10-12, Beijing, Vol. 7997,pp. 79970S 1~6. (EI 检索)
[8] 窦建平,戴先中,孟正大.可重构制造系统的流水线构形优化[C].2007年全国博士生学术论坛(机械、控制、管理学科),上海: 同济大学,2007,机械工程卷论文集:801-812.(获“优秀论文奖”和“最佳表达奖”)